A commissioning turnover package, also known as a handover package or turnover documentation, is a collection of documents and information that is prepared and provided by the contractor or construction team to the owner or operator of a facility upon completion of a construction project. This package is typically handed over during the commissioning phase, which involves testing, inspecting, and verifying the systems and components of the facility to ensure they are functioning as intended.
The contents of a commissioning turnover package may vary depending on the specific project and the requirements of the owner or operator. However, it generally includes the following information:
1. Operating and maintenance manuals: These manuals provide detailed instructions on how to operate and maintain various systems and equipment within the facility. They typically include diagrams, troubleshooting guides, and recommended maintenance schedules.
2. As-built drawings: These drawings reflect any changes or modifications made during the construction process and provide an accurate representation of the final design. They include architectural, structural, mechanical, electrical, and plumbing drawings.
3. Equipment and system documentation: This includes documentation for all installed equipment and systems, such as HVAC systems, electrical panels, fire suppression systems, plumbing fixtures, and more. It may include equipment specifications, performance data, installation records, and warranties.
4. Test and inspection reports: These reports document the results of various tests and inspections conducted during the commissioning process. They provide evidence that the systems and components meet the required standards and specifications.
5. Training materials: If training is provided to the facility staff, the commissioning turnover package may include training manuals, videos, or other materials that help the staff understand how to operate and maintain the facility effectively.
6. Warranty information: This section includes information about warranties provided by equipment manufacturers, subcontractors, or the contractor. It outlines the terms and duration of the warranties and any specific maintenance requirements to keep the warranties valid.
7. Compliance and regulatory documents: Depending on the nature of the facility, the package may include permits, certificates, and other compliance-related documents to demonstrate that the facility meets all relevant regulations and codes.
8. Emergency procedures: This section provides guidelines and protocols for emergency situations, such as evacuation procedures, emergency contact information, and safety plans.
The commissioning turnover package serves as a valuable resource for the owner or operator of the facility, ensuring that they have all the necessary information to operate, maintain, and troubleshoot the systems and equipment effectively. It facilitates a smooth transition from the construction phase to the operational phase of the facility.